SIF RISK ASSESSMENT – PROJECT PROFILE
Evaluate role & contract risk, interface risk, context/complexity, SIF hazards, and systemic amplifiers. All fields are required; N/A must be explicitly selected where applicable.
PROJECT CONTEXT
SIF HAZARD EXPOSURE
–
Average Severity: –
Average Probability: –
Average Risk: –
CRITICAL MAX RISK
–
Max Severity: –
Max Probability: –
Hazards: –
Amplifiers: –
SEVERITY PROFILE
Average Severity: –
Max Severity: –
Drivers: –
PROBABILITY PROFILE
Average Probability: –
Max Probability: –
Drivers: –
SECTION A – CONTRACT ROLE & LIABILITY RISK
SECTION B – INTERFACE / MULTI-EMPLOYER RISK
SECTION C – CHANGE, RESOURCES, SIMOPS, LOGISTICS
SECTION D – SIF HAZARD EXPOSURE (15 CAP HAZARDS)
SECTION E – SYSTEMIC AMPLIFIERS (PROBABILITY ENGINE)
Scores ≥3 require explanation; scores ≥4 require corrective action.
Scores ≥3 require explanation; scores ≥4 require corrective action.